The works were undertaken adjacent to an existing arterial road carrying over 35,000 vehicles daily, requiring meticulous staging and traffic management to maintain flow and safety.
Project value has been adjusted to reflect approximate current-day value as at 2025, based upon industry recognised construction indexation published by Rawlinson.
The project was delivered through a multi-staged construction program involving extensive traffic management and night works to minimise disruption to road users.
Approximately 20,000m³ of earthworks were completed to facilitate the road duplication and associated infrastructure works.
Works included extensive treatment of existing subgrade and construction of 20,000m² of new asphalt pavement.
The project delivered 1,000 linear metres of new stormwater reticulation infrastructure
A total of 320 linear metres of sewer reticulation and 250 linear metres of water reticulation were installed as part of the corridor upgrade.
Electrical works included street lighting, ITS backbone infrastructure, Energex conduits and two new signalised intersections along the upgraded corridor.
The project incorporated 4,000m² of new concrete footpaths to improve pedestrian connectivity and accessibility.
Works included construction of 330 linear metres of kerb, 900m² of stencilled concrete infill and 10,000m² of streetscaping.
All works were completed in close proximity to existing residences and under live traffic conditions to City of Gold Coast and DTMR standards.
The works were undertaken adjacent to an existing arterial road carrying over 35,000 vehicles daily, requiring meticulous staging and traffic management to maintain flow and safety.
The project included 20,000m³ of earthworks, extensive subgrade treatment, and construction of 20,000m² of new asphalt pavement. Key infrastructure works comprised 1,000 linear metres of stormwater reticulation, 320 metres of sewer reticulation, and 250 metres of water reticulation. Electrical installations spanned the entire length of the duplication, incorporating street lighting, ITS backbone, Energex conduits, and two new signalised intersections. Additional features included 4,000m² of concrete footpaths, 330 metres of kerb, 900m² of stencilled concrete infill, and 10,000m² of landscaping.
Delivered under live traffic conditions and in close proximity to residential areas, the project adhered to City of Gold Coast and DTMR standards. Alder’s collaborative approach resolved complex ground conditions and supported the progression of the adjacent Homemaker Centre development.