Addressing critical deterioration within an aging podium, Alder delivered a comprehensive remediation and upgrade to restore structural integrity and enhance resident amenities. Works targeted failing membranes and construction joints that had caused movement and cracking across driveway and landscaped areas.
Project value has been adjusted to reflect approximate current-day value as at 2025, based upon industry recognised construction indexation published by Rawlinson.
Delivered ahead of schedule and within client budget.
Removal of existing podium finishes and reinstatement of waterproofing across the full podium area. The new membrane system was developed with specialist waterproofing consultants and applicators to meet the client's 20-year warranty requirement.
Specialist repairs were undertaken to areas affected by structural concrete cancer.
The project included new screeds, pavers and concrete surfacing to nominated roadways and stairs. Existing planter walls, garden beds and landscaped areas were also refurbished.
Design and construction of new irrigation system to landscaped areas including installation of new feature lighting to podium area and garden beds.
Upgrades to the pool area and replacement of fencing to the pool cabana area.
Works were staged to maintain resort access at all times and reduce noise impacts on residents and guests. Programming prioritised completion of the pool area and landscaping before the Christmas holiday period.
Strict traffic and pedestrian management measures were implemented throughout construction, particularly during plant and equipment movements, to maintain safety for residents, guests and neighbouring properties.
Addressing critical deterioration within an aging podium, Alder delivered a comprehensive remediation and upgrade to restore structural integrity and enhance resident amenities. Works targeted failing membranes and construction joints that had caused movement and cracking across driveway and landscaped areas.
The project involved demolition of existing surfaces and full reinstatement of waterproofing across the podium, along with concrete remediation, new screeds, paving and resurfacing of access roadways and stairs. Landscaping was extensively upgraded, including new irrigation systems, feature lighting, planter walls and garden beds, alongside refurbishment of the pool area and replacement of fencing to the pool cabana.
Alder staged and coordinated construction to maintain access for residents and guests while minimising disruption. Specialist waterproofing systems were implemented to meet long-term performance requirements, and the project was delivered ahead of schedule, demonstrating strong planning and execution within a live environment.