Alder was entrusted with the delivery of this state-of-the-art 469-seat auditorium, following the successful completion of two earlier stages at the campus.
Project value has been adjusted to reflect approximate current-day value as at 2025, based upon industry recognised construction indexation published by Rawlinson.
Purpose-built 469-seat theatre featuring advanced performance technology and flexible auditorium spaces within a constrained operational school environment.
The theatre incorporated a full fly tower with electrically operated hoisting and lighting bars to support a wide range of performance requirements.
A state-of-the-art audio-visual system was installed and designed to accommodate future expansion requirements.
An operable orchestra lift provided flexibility for theatre productions, lectures, stage extensions and orchestra performances.
A 60,000-litre underground rainwater storage tank was installed beneath the seating area to supply flushing water to the auditorium amenities.
The basement level included amenities, prop and costume storage, dressing rooms and dedicated dance class facilities.
Three soundproof rooms and a theatre manager's office were incorporated on the first floor to support music education and theatre operations.
Feature Tasmanian myrtle acoustic wall cladding and ceiling deflection panels enhanced the theatre's acoustic performance and interior character.
The project was delivered despite significant logistical constraints, including limited site access and surrounding operational school facilities.
Alder was entrusted with the delivery of this state-of-the-art 469-seat auditorium, following the successful completion of two earlier stages at the campus.
Despite tight site constraints—surrounded by operational classroom blocks, a performing arts centre, a 6-metre retaining wall, and a single-lane access road—the project was delivered seamlessly. The theatre featured a full fly tower with electrically operated hoisting and lighting bars, an operable orchestra lift for flexible use, and a future-ready audio-visual system. Beneath the seating area, a 60,000L rainwater tank was installed to service the amenities.
Additional inclusions comprised a basement with dressing rooms, dance facilities, and storage, as well as three soundproof tuition rooms and a theatre manager’s office on the first floor. The interior was finished with Tasmanian myrtle acoustic wall cladding and ceiling deflection panels.