Delivered in two stages by Alder for Redland City Council, the project links Snapper Street lookouts over Frenchman’s Beach with the Gorge Walk Trailhead, creating a seamless coastal pathway through one of Queensland’s most scenic destinations.
Project value has been adjusted to reflect approximate current-day value as at 2025, based upon industry recognised construction indexation published by Rawlinson.
Construction was completed in a challenging coastal environment with difficult terrain, ground conditions and remote site logistics.
Works were carefully staged and sequenced to minimise disruption to residents and visitors.
The project delivered timber and composite boardwalks, viewing decks and lookouts, creating safe and accessible connections along the coastline.
Stage 2 included the construction of the Frenchman Stairs, incorporating 220 steps over a 40-metre vertical rise.
A total of 225 screw piles, pile caps and driven composite piles were installed across both stages to support the walk's boardwalks, stairs and viewing structures.
The project included decorative concrete surfaces and 477m² of coloured bitumen pathways to improve pedestrian access and connectivity.
Park infrastructure included custom seating, picnic tables, drinking fountains, bicycle racks, fencing, bollards and waste facilities.
Extensive landscaping and revegetation works incorporated mulch, topsoil, erosion control measures, jute matting, turf and native planting across the site.
Local North Stradbroke Island businesses, subcontractors and Indigenous workforce participants were engaged throughout the delivery of the project.
Roadworks included pavement construction, kerb and channel, stormwater infrastructure, headwalls, bollards, line marking and signage to support safe access throughout the precinct.
Land remediation works were undertaken, including the removal of unsuitable material to prepare the site for construction.
Delivered in two stages by Alder for Redland City Council, the project links Snapper Street lookouts over Frenchman’s Beach with the Gorge Walk Trailhead, creating a seamless coastal pathway through one of Queensland’s most scenic destinations.
Stage 1, completed in late 2021, involved the installation of timber boardwalks and viewing decks using Wagners CFT substructure and Modwood decking, alongside decorative concrete surfacing and coloured bitumen footpaths. Works included road construction with kerb and channel, stormwater infrastructure, and land remediation. Park furniture, fencing, bike racks, and waste enclosures were installed, complemented by landscaping with rock retaining walls, erosion control matting, and native planting. Community engagement and careful staging ensured minimal disruption during peak holiday periods, with local subcontractors and Indigenous workforce participation.
Stage 2 extended the trail from Snapper Street to the Gorge Walk Trailhead, incorporating 900m² of composite boardwalk and the Frenchman Stairs upgrade—220 steps spanning a 40-metre vertical rise. Additional works included 477m² of Streetflex coloured bitumen paths, custom park furniture, and 4,500m² of landscaping with mulching, jute matting, and revegetation. Structural elements comprised 130 screw piles and 130 driven composite piles with concrete pilecaps. Alder navigated challenging terrain and remote site logistics while engaging local North Stradbroke Island businesses for civil works and landscaping.
Together, these stages showcase Alder’s expertise in delivering complex infrastructure in environmentally sensitive and high-profile locations, balancing functionality, durability, and community benefit.