Ageing awning structures nearing the end of their service life required refurbishment to address corrosion and improve long-term durability and performance.
Project value has been adjusted to reflect approximate current-day value as at 2025, based upon industry recognised construction indexation published by Rawlinson.
Delivered two weeks ahead of original programme despite multiple work stoppages required to accommodate events and functions within the venue.
The existing awning system was redesigned to address premature deterioration and corrosion issues. The new design incorporated curved CHS steel structures with PTFE tensile membrane lining to improve longevity and performance.
To overcome load restrictions on the existing concrete apron, the team utilised a compact spider crane to undertake demolition and removal works which allowed the ageing awnings to be safely dismantled and removed without exceeding site load limitations.
The new awning structures were pre-painted off-site and the membrane lining was installed prior to delivery, reducing the amount of work required on-site and helped streamline installation activities.
Careful planning was required to manage access, sequencing and delivery, including the transport and installation of large awning sections measuring up to 4m x 8m within the constrained convention centre environment.
Works were completed while the convention centre remained operational. Hoarding, exclusion zones and strict safety controls were implemented to manage pedestrian movements and protect staff, visitors and contractors during high-risk activities.
Ageing awning structures nearing the end of their service life required refurbishment to address corrosion and improve long-term durability and performance.
Installation of new curved circular hollow section (CHS) steel structures with PTFE tensile membrane lining transformed the performance and appearance of the awnings, with prefabricated components and off-site finishing used to streamline on-site delivery. The scope was further enhanced with the integration of programmable RGB lighting to the underside, elevating both functionality and visual impact.