Located on Babarra Street, the new facility accommodates over 150 field and support staff and houses 40 response vehicles, enabling faster response to outages and maintenance needs in the region.
Project value has been adjusted to reflect approximate current-day value as at 2025, based upon industry recognised construction indexation published by Rawlinson.
A new operational depot supporting more than 150 Energex staff improved response capability across Brisbane’s inner northern suburbs and CBD.
Demolition works included asbestos removal, followed by extensive site preparation to enable construction of the new depot.
The project involved excavation and remediation of 20,000m² of soil, alongside the diversion of existing services across the site.
Construction delivered a contemporary two-level office facility comprising ground floor and Level 1 office space integrated with a main warehouse.
High-quality architectural finishes were incorporated throughout the development, supporting a modern and functional workplace environment.
A 100kW solar system was installed as part of the project’s building services infrastructure.
The hardstand area included a dedicated truck wash facility and significant suspended concrete slabs to accommodate large vehicle movements throughout the depot.
Extensive external works included new sewer, water and power connections, together with concrete aprons across the site.
Detailed programme sequencing and delineated work zones were implemented to manage project delivery efficiently.
The project maintained an active interface with the neighbouring sporting club through ongoing community engagement and coordination.
Located on Babarra Street, the new facility accommodates over 150 field and support staff and houses 40 response vehicles, enabling faster response to outages and maintenance needs in the region.
The project included the construction of a 2,040m² warehouse and 1,290m² of contemporary office space across two levels. Works involved asbestos removal, bulk earthworks with remediation of 20,000m² of soil, and extensive service diversions. The depot features high-quality architectural finishes, a 100kW solar system, and a hardstand area with a truck wash facility. Significant suspended concrete slabs were incorporated to support large vehicle access. External works included new sewer, water, and power connections, concrete aprons, and a detailed staging program to manage site logistics. Alder also maintained strong community engagement with neighbouring stakeholders, including a local sporting club, throughout delivery.