A purpose‑built community housing development was delivered in Miami, providing a mix of social housing, accessible apartments and specialist disability accommodation.
Project value has been adjusted to reflect approximate current-day value as at 2025, based upon industry recognised construction indexation published by Rawlinson.
Completed eight weeks ahead of schedule due to strict programme management and transparent communication during latent conditions.
The development included 20 apartments delivered to Gold standard, 10 apartments delivered to Platinum standard and two apartments designed as Specialist Disability Accommodation (High Physical Support).
Residents benefited from lift access throughout the building, a rooftop communal barbecue area and 33-bay undercroft parking.
Detailed design management and coordination, offering value engineered solutions.
Extensive engagement with neighbouring residents and stakeholders was undertaken throughout construction. Careful sequencing of works helped minimise disruption within the surrounding community while maintaining project progress.
Navigating challenging ground conditions and logistics within tight site bounds.
Construction activities were carefully managed alongside major infrastructure works occurring on the Gold Coast Highway, including coordination with the surrounding transport corridor and associated stakeholders.
The works included demolition of an existing 18-unit residential building and the compliant management, removal and disposal of asbestos-containing materials.
A purpose‑built community housing development was delivered in Miami, providing a mix of social housing, accessible apartments and specialist disability accommodation.
Design and construction of a four‑storey residential building comprising community and social housing apartments, including dwellings designed to higher accessibility standards and dedicated special disability accommodation. The works involved demolition of the existing apartment complex with compliant asbestos management, detailed design coordination and value‑engineered solutions, and complex site logistics within tight boundaries.
Delivered adjacent to the Gold Coast Highway and light rail corridor, the project required extensive traffic management, stakeholder engagement and careful sequencing of works to minimise disruption to neighbouring residents and surrounding infrastructure projects.