A refreshed and reconfigured library space was delivered at Banora Point High School, enhancing usability and supporting a range of learning activities.
Project value has been adjusted to reflect approximate current-day value as at 2025, based upon industry recognised construction indexation published by Rawlinson.
Delivering within an operational school environment, requiring careful coordination, detailed staging and management of tight site constraints to minimise disruption to daily school activities.
Detailed staging was developed to align construction activities with the school timetable.
Works were undertaken within a constrained site environment while maintaining safe access and ongoing school operations.
The team effectively managed extended procurement lead times for materials and key project items within a tight construction timeframe.
Despite the challenges of a live school environment and procurement constraints, the project was completed on time and within budget.
A refreshed and reconfigured library space was delivered at Banora Point High School, enhancing usability and supporting a range of learning activities.
Internal demolition and reconfiguration reshaped key areas including the entrance, bag storage and learning spaces, creating a more functional and contemporary layout. New facilities were introduced, including library administration areas, a kitchenette, chair storeroom, computer learning space, main library and dedicated senior study areas, supported by a new electrical layout and upgraded security systems. Delivered within a live school environment, the project required careful staging and coordination around the school timetable to minimise disruption, with works completed on time and within programme.