The project introduced four boutique residential towers overlooking Lake Orr, comprising 120 one, two, and three-bedroom apartments.
Project value has been adjusted to reflect approximate current-day value as at 2025, based upon industry recognised construction indexation published by Rawlinson.
Four residential towers delivered 120 apartments alongside extensive resort-style amenities and panoramic rooftop spaces.
Solar panels were installed on the rooftop of Tower 4 to supply electricity to the development and support ongoing building operations.
A large basement car park and dedicated storage areas were provided for residents, enhancing convenience and functionality.
All apartments were fitted with granite benchtops, contributing to the quality and durability of the kitchen finishes.
Apartments featured high-quality finishes throughout, complemented by generously sized balconies designed to maximise outdoor living opportunities.
Residents have access to two resort-style pools, a gym, sauna, spa, rooftop terraces and landscaped gardens.
Each apartment included fully retractable stacked sliding doors opening onto balconies, timber-look flooring to living areas, stone benchtops and quality stainless-steel appliances.
Construction was undertaken adjacent to busy pedestrian pathways, requiring ongoing communication and engagement with the surrounding community throughout delivery.
The project introduced four boutique residential towers overlooking Lake Orr, comprising 120 one, two, and three-bedroom apartments.
Each apartment featured high-quality finishes, generous balconies, granite and stone benchtops, timber-look flooring, and stainless steel appliances. Residents enjoyed resort-style amenities including two swimming pools, a gym, sauna, spa, landscaped gardens, and rooftop terraces with panoramic 360-degree views. Sustainability was prioritised with solar panels installed on Tower 4, and a large basement car park provided ample storage and parking. Delivered in a high-traffic pedestrian area, the project required careful community engagement and staging to ensure minimal disruption throughout construction.